Difference between revisions of "URT:Agenda-15-09-2014"
Line 287: | Line 287: | ||
* Minutes previous meeting - [https://indico.egi.eu/indico/materialDisplay.py?materialId=minutes&confId=2300 Minutes 04-08-2014] | * Minutes previous meeting - [https://indico.egi.eu/indico/materialDisplay.py?materialId=minutes&confId=2300 Minutes 04-08-2014] | ||
* [https://indico.egi.eu/indico/materialDisplay.py?materialId=minutes&confId=2314 Minutes 15-09-2014] | |||
= Audio conference details = | = Audio conference details = |
Revision as of 20:04, 15 September 2014
Adobe connect direct link | Conference system is on adobe connect, no password required. |
UMD releases status
Status of the products verification/staged rollout
Released
- Last release UMD 3.8.0
- Released at 24/07/2014
Ready to be released
- qcg-broker-3.4.0
- qcg-broker-client-3.4.0
- qcg-broker-egi-is-provider-3.4.0
- qcg-egi-is-conf-3.4.0
In Staged Rollout
- none
In Verification
- canl v. 2.2.3
- cream-ge v. 2.2.0
- cream-lsf v. 2.0.4
- cream-slurm v. 1.0.2
- cream-torque v. 2.1.4
- qcg-computing-3.4.0 (with dependencies)
- qcg-notifications-3.4.0 (with dependencies)
In preparation
- DMC latest releases (DAVIX 0.3.6, gfal 2.6.8, SRM-IFCE 1.20.1, gfal2-util 1.0, gfalFS 1.5, CGSI-gSOAP 1.3.6 and FTS3 v 3.2.26 )
- EMI 20 update ( APEL Parsers, v. 2.3.1, APEL publiser 4.2.1, BDII core 1.6.0, UI & WN 3.1.0, WMS 3.6.6 and WMS UI 3.6.2).
- dCache srmclient 2.2.27, server 2.6.31
- ARC v. 4.2.0
Rejected
- -----
Timeline for the next UMD updates
- End of October
- Mid December
Updates from the product teams
This section is directly contributed by the product teams. Please, add under your section the scheduled releases with a short comment about the updates introduced and where they are going to be released (EMI repositories, EPEL, private repositories ecc), linking external pages with these information is ok, but please add at least the expected date of the next release. It is important to discuss, within the URT, changes that may affect directly or indirectly other products. The text will be copied into the agenda of the next URT meeting, PT will just need to check that all the information are up to date. Please, feel free to alter the template if it doesn't feet with your needs.
APEL
- Release version x.y.z Expected: 2013-xx-yy
- Main changes: (including other products affected)
- Other information:
ARC
- Release 13.11u2 version 4.2.0 to be released released in NG-repos by mid August, 2014
- Main changes: fix the nagios probes that broke in the previous release, but there is also an extension to the emi-es schema to make it useable for ATLAS.
- Other information:
- Some technical problems, mostly summer vacation time. RC1 successfully tested and ready for final tag, but still needs to be tagged and built.
Argus
- Release version w.k.j Expected on: 2013-xx-yy
- Main changes: (including other products affected)
- Other information:
dCache
- dCache Release Schedule
srmclient 2.2.27, export path bug fixed (released in appdb) dcache server 2.6.31 (released in appdb)
- Main changes:
- Bug fixes
- Other information:
BDII
- Release version: glite-schema-2.0.11-1 is available
- Main changes: GLUE 2 schema changes (described in release notes)
- Other information: http://gridinfo.web.cern.ch/sys-admins/bdii-releases/glue-schema-2011-1
DPM/LFC
- DPM
- dpm-dsi-1.9.3-3 has been released to EPEL to fix an issue with transfers managed by FTS2. FTS3 transfers are not affected by the bug.
- https://svnweb.cern.ch/trac/lcgdm/blog/dpm-dsi-1.9.3-3
GFAL/lcg_utils
- The CERN Data Management Clients publish their releases here: http://dmc.web.cern.ch/releases
- In principle, we would like all these releases to be included in UMD. Currently (25/08/2014) outstanding are:
- davix 0.3.6 : http://dmc.web.cern.ch/release/davix-036
- gfal2 2.6.8 : http://dmc.web.cern.ch/release/gfal-2.6.8
- srm-ifce 1.20.1 : http://dmc.web.cern.ch/release/srm-ifce-1201
- gfal2-python 1.5 : http://dmc.web.cern.ch/release/gfal2-python-15
- gfal2-util 1.0 : http://dmc.web.cern.ch/release/gfal2-util-10
- CGSI-gSOAP 1.3.6 : http://dmc.web.cern.ch/release/cgsi-gsoap-136
- gfalFS 1.5 : http://dmc.web.cern.ch/release/gfalfs-15
FTS
- FTS3 update released, v 3.2.26
- Main changes : http://fts3-service.web.cern.ch/documentation/releases
Frontier-Squid
- Release version: 2.7STABLE9-18.1; Released: 15-09-2014
- Main changes: http://frontier.cern.ch/dist/rpms/frontier-squidRELEASE_NOTES
- Other information (repository): http://frontier.cern.ch/dist/rpms
EMIR
- Release version: ; Expected:
- Main changes:
- Other information:
UNICORE
We will publish packages for UMD via AppDB at https://appdb.egi.eu/store/software/unicore
- UCC 7.0.1 Expected on: 2014-03-01
- Main changes: (including other products affected)
- Other information:
- UNICORE/X 7.0.0 Expected on: 2014-03-01
- Main changes: (including other products affected)
- Other information:
- TSI 7.0.0 Expected on: 2014-03-01
- Main changes: (including other products affected)
- Other information:
- Gateway 7.0.0 Expected on: 2014-03-01
- Main changes: (including other products affected)
- Other information:
- Registry 7.0.0 Expected on: 2014-03-01
- Main changes: (including other products affected)
- Other information:
LB
- Release version 4.1.2 Expected: 2014-06-27
- Fixes for issues caused by 4.1.1
- More info: https://github.com/CESNET/glite-lb/wiki/Glite-l&b-release-page#LB_4121
- Release version 4.1.1 Expected: 2014-05-29
- Main changes: Packaging fixes, memleak fixes
- Other information: https://github.com/CESNET/glite-lb/wiki/Glite-l&b-release-page#LB_4111
Gridsite
- Release version 2.2.5 released in late June.
- Other information: https://github.com/CESNET/gridsite/wiki/Gridsite-release-page#GridSite_2251
- Release version 2.2.3 Released: late 2013-03-31
- Main changes: Fixing improperly initiated time constants in signature verification code.
- Other information: Released after the official March EMI Release.
- https://github.com/CESNET/gridsite/wiki/Gridsite-release-page#GridSite_2231
Proxyrenewal
- Release version x.y.z Expected: 2013-xx-yy
- Main changes: (including other products affected)
- Other information:
CANL
- Release version caNl-c 2.1.5, TB Released in June 2014
- https://github.com/CESNET/canl-c/wiki/caNl-c-Release-Page#caNlc_2151
- Release version caNl-c 2.1.4, Released 2014-03-31
- Main changes: This revision fixes long-discussed certificate chain validation errors.
- Other information: Released after the official March EMI Release
- https://github.com/CESNET/canl-c/wiki/caNl-c-Release-Page#caNlc_2141
gLite- security
- Release version w.k.j Expected on: 2013-xx-yy
- Main changes: (including other products affected)
- Other information:
gLExec-wn
- LCMAPS-plugins-C-PEP & EES(+xacml library) - planning an update for next month ( July 2014)
- Main changes: (including other products affected)
- Other information:
CREAM
- BLAH v. 1.20.7 - Expected: Sept, 2014
- Main changes:
- Other info:
- Wrong condor_status renaming in postinst
- BUpdate interval does not work with GE
- CREAM v. 1.16.4 - Expected: Sept, 2014
- Main changes:
- Other info:
- Use VOMS/CanL APIs instead of VOMS UI
- Broken link for LB java client
- Transfer to CREAM failed due to exception: not constant expression found
STORM
- Release version 1.11.5 - emergency
- Expected: A.S.A.A, 2014
- Main changes:
- Fixes in 1.11.5
- Other information:
- fixes important issue affecting T1/GPFS 3.5
- Release version 1.11.6
- Expected: End of July, 2014
- Main changes:
- Fixes in 1.11.6
- Other information:
- improvements in STORM Glue2 info-provider
- yaim-storm asks for a mandatory variable even if it's been defined
VOMS
- Release versions:
- VOMS Admin server v. 3.3.0
- VOMS Clients v. 3.0.5, VOMS API Java v. 3.0.4
- VOMS C APIs, native clients and server v. 2.0.12
- Expected: Mid July, 2014
- Main changes:
- VOMS Admin server v. 3.3.0
- VOMS Clients v. 3.0.5, VOMS API Java v. 3.0.4
- VOMS C APIs, native clients and server v. 2.0.12
- Other information:
- VOMS server:
- voms-configure help incomplete
- VOMS admin publishes wrong values for GlueServiceStatusInfo
- Allow users to change their email address when OrgDB integration is enabled
- VOMS database upgrade fails when the db was created with voms-admin v. 2.5.3
- Group manager selection should be mandatory when group managers are enabled in the registration process
- VOMS Clients v. 3.0.5, VOMS API Java v. 3.0.4
- VOMS clients do not honour VOMSES vo aliases
- VOMS Java APIs should randomize the selection of the voms server endpoint
- voms-proxy-init ignores -cert option when used with -noregen
- Fix tar archive download instructions for voms-clients
- VOMS Java APIs should handle empty VOMS certificate and LSC store gracefully
- VOMS C APIs, native clients and server v. 2.0.12
- VOMS should have more stringent checks on incoming AC lifetime parameter
- voms-proxy-init crashes when run as root and host certificate is not present
- VOMS server embeds gSoap (while it should take it from the OS)
- VOMS server:
WMS
- WMS Server v. 3.6.6 & WMS UI 3.6.2 - Expected: Sept. 2014
- Main changes:
- see WMS Server v. 3.6.6
- see WMS UI 3.6.2
- Main changes:
Globus
- Globus Toolkit version 6.0 was released 11 September.
- Fedora/EPEL build currently in progress in koji.
- Main changes: Backwards compatible, no soname changes.
- Other information: The Grid Packaging Tools (GPT) will be dropped in favour of standard autotools. If you are relying on GPT tools or GPT metadata files, now is the time to migrate. The pkg-config support has been the preferred way to find Globus Toolkit dependencies a long time. The globus-makefile-header command will be replaced with a wrapper around pkg-config calls to provide some backward compatibility, but its use is not recommended. No GPT metadata files will be installed with the new release.
QCG
- Release version 3.4.0, planned for October
- qcg-broker and qcg-broker-client - ready to be released
- qcg-computing and qcg-notification - in verification
Other topics
Java 7
- SL5.9:
- JAVA
- The closed-source Java 6 packages are end of life as of Feb 2013. They are not included in SL5 starting with SL5.9 . Openjdk 1.6 and 1.7 are included by TUV. It is believed that openjdk is an acceptable replacement. The closed-source packages can still be downloaded from http://java.sun.com/
- JAVA
- Oracle Java SE Support Roadmap
- Oracle Java 6 - Java SE 6 End of Public Updates Notice
- SLC announcement - Oracle (Sun) Java 6 (1.6) End of Life notice: February 2013
EPEL 7
- EPEL 7 Beta - "a few months after the final RHEL is released"
Actions
AOB
- Next meetings 29 Sept., 15:00 CET
Minutes
- Minutes previous meeting - Minutes 04-08-2014
- Minutes 15-09-2014
Audio conference details
Room link: http://connect.ct.infn.it/egi-inspire-sa1-ter/
Please provide you Name and product team/affiliation as Guest Name.
In left top corner you will find "Meeting->Audio Setup Wizard" Button which will help you to configure your audio.
You can test Your Computer with this link http://connect.ct.infn.it/common/help/en/support/meeting_test.htm
Adobe Connect tutorials: http://tv.adobe.com/show/learn-adobe-connect-8/
Adobe connect is flash-based, please if you have issues with your configuration try Chrome as browser.
Back to the URT agendas list page: URT_meetings_agendas