Difference between revisions of "EGI-InSPIRE:Jra1 2014-01-21"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
== 1. Progress on Milestones Deliverables == | == 1. Progress on Milestones Deliverables == | ||
* MS711 | |||
** Current Status: ToC - Contribution from PTs collected | |||
** Draft Complete: 31st of January | |||
** Document URL: https://documents.egi.eu/document/2069 | |||
** Moderator: Malgorzata Krakowian | |||
** Reviewer: Christos Kanellopoulos | |||
* D7.4 | |||
** Current Status: ToC TBD | |||
** Draft Complete: 3rd of March | |||
** Document URL: NA | |||
** Moderator: Peter Solagna | |||
** Reviewers: Marcin Radecky and TBD | |||
* Collecting input for QR15 | |||
== 2. Critical Issues == | == 2. Critical Issues == |
Revision as of 10:05, 22 January 2014
<< JRA1 weekly reports main page
1. Progress on Milestones Deliverables
- MS711
- Current Status: ToC - Contribution from PTs collected
- Draft Complete: 31st of January
- Document URL: https://documents.egi.eu/document/2069
- Moderator: Malgorzata Krakowian
- Reviewer: Christos Kanellopoulos
- D7.4
- Current Status: ToC TBD
- Draft Complete: 3rd of March
- Document URL: NA
- Moderator: Peter Solagna
- Reviewers: Marcin Radecky and TBD
- Collecting input for QR15
2. Critical Issues
3. Major work done during the past week by task
3.1 TJRA1.1
3.2 TJRA1.2 TJRA1.3 TJRA1.5
3.2.1 SAM
- Drafting detailed technical time plan for migration of SAM
- Supporting setup of the testing instance at IN2P3
- Contribution to MS711 and QR15
- Attended JRA1 phone conference and presented SAM status
- Attending SAM migration meeting
3.2.2 GOCDB
3.2.3 GGUS
- Working on Milestone MS711
- Implementation and testing of CMS integration into GGUS
- Testing merge of GGUS and xGUS structures
- Preparing next GGUS release
- Ticket monitoring
- Weekly phone conference on GGUS development (shopping list)
- JRA1 phone conference