Difference between revisions of "EGI-InSPIRE:Ibergrid-QR6"
Jump to navigation
Jump to search
Line 109: | Line 109: | ||
===2.1. Progress Summary=== | ===2.1. Progress Summary=== | ||
# | # LCMAPS message report sent to SA1 coordinators, and introduced in RT ticket: https://rt.egi.eu/rt/Ticket/Display.html?id=1983 | ||
# | # Internal survey to the Ibergrid sites about evaluation of the quality of services and tools at disposal of the site administrators. Analysis and discussion of the survey results in the weekly Ibergrid Operations meeting. | ||
# | # New operations Wiki: http://ibergrid.lip.pt. | ||
# | # Analysis of the 1st EGI review report. | ||
# | # Push sites to implement VOMS redundancy for the Ibegrid VOs | ||
# | # Implementation of the TopBDII HA proposal in NGI_IBERGRID. Process is being tracked via GGUS ticket: https://ggus.eu/ws/ticket_info.php?ticket=74883 | ||
===2.2. Main Achievements=== | ===2.2. Main Achievements=== |
Revision as of 14:10, 2 November 2011
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR6 | Ibergrid | LIP & CSIC | Álvaro Simón García, Esteban Freire García (CSIC) |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
19-23 September | Lyon, France | EGI Technical Forum 2011 | ~ 15 |
|
12-16 September | Lisbon, Portugal | Timbus F2F meeting | 5 |
|
19-23 September | Santander | XXXIII Bienal de la Real Sociedad Española de Física | 2 | “Aplicaciones de Física utilizando la Infraestructura de e-Ciencia del IFIC” http://indico.ific.uv.es/indico/materialDisplay.py?contribId=0&materialId=paper&confId=418 |
26-27 Sep | Amsterdam | LHCOPN-LHCONE joint meeting | 1 |
http://indico.cern.ch/conferenceOtherViews.py?view=standard&confId=149042 |
12 October | Cern, Switzerland | Staged Rollout Process | 1 |
|
13-14 October | Barcelona | HPC SysAdmin Meeting'11 | 1 |
http://hpc.xrqtc.org/index.php/conference-training/anual-meeting |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|---|---|---|
OCDgLite. An easy way to deploy a customized gLite grid environment | EGI Technical Forum 2011 (19-23 September). Poster. | Jesús Santisteban, Miguel Angel Díaz, Manuel Enrique Cotallo | |
Despliegue auto-adaptativo e inteligente de aplicaciones grid basado en la Búsqueda de Entorno Variable | VIII Congreso español sobre metaheuristicas, algoritmos evolutivos y bioinspirados - Conference | María Botón-Fernández, Miguel A. Vega-Rodríguez, Francisco Prieto Castrillo | |
Modelo de despliegue auto-adaptativo en entornos grid desde las perspectiva de los sistemas complejos | VIII Congreso español sobre metaheuristicas, algoritmos evolutivos y bioinspirados - Conference | María Botón-Fernández, Francisco Prieto Castrillo, Miguel A. Vega-Rodríguez | |
Self-Adaptive and Intelligent Deployment of Grid Applications Based on Several Perspectives from the Artificial Intelligence Field | Applied Soft Computing (Elsevier) - Journal | María Botón-Fernández, Miguel A. Vega-Rodríguez, Francisco Prieto Castrillo |
2. ACTIVITY REPORT
2.1. Progress Summary
- LCMAPS message report sent to SA1 coordinators, and introduced in RT ticket: https://rt.egi.eu/rt/Ticket/Display.html?id=1983
- Internal survey to the Ibergrid sites about evaluation of the quality of services and tools at disposal of the site administrators. Analysis and discussion of the survey results in the weekly Ibergrid Operations meeting.
- New operations Wiki: http://ibergrid.lip.pt.
- Analysis of the 1st EGI review report.
- Push sites to implement VOMS redundancy for the Ibegrid VOs
- Implementation of the TopBDII HA proposal in NGI_IBERGRID. Process is being tracked via GGUS ticket: https://ggus.eu/ws/ticket_info.php?ticket=74883
2.2. Main Achievements
- Two new sites were joined to the infrastructure: ARAGRID-CIENCIAS and RC-GISELA-CETA.
- It has been installed a dedicated WMS to support the Ibergrid VOs.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
UOGRID site is still suspended. | This site entering in suspension status after 1 month of downtime during the last QR5. |
There was several issues related with the Ibergrid Regional Nagios:
|