Difference between revisions of "EGI-InSPIRE:Ibergrid-QR6"
Jump to navigation
Jump to search
Line 73: | Line 73: | ||
<br /> | <br /> | ||
===1.3. PUBLICATIONS=== | ===1.3. PUBLICATIONS=== |
Revision as of 14:06, 2 November 2011
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR6 | Ibergrid | LIP & CSIC | Álvaro Simón García, Esteban Freire García (CSIC) |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
19-23 September | Lyon, France | EGI Technical Forum 2011 | ~ 15 |
|
12-16 September | Lisbon, Portugal | Timbus F2F meeting | 5 |
|
19-23 September | Santander | XXXIII Bienal de la Real Sociedad Española de Física | 2 | “Aplicaciones de Física utilizando la Infraestructura de e-Ciencia del IFIC” http://indico.ific.uv.es/indico/materialDisplay.py?contribId=0&materialId=paper&confId=418 |
26-27 Sep | Amsterdam | LHCOPN-LHCONE joint meeting | 1 |
http://indico.cern.ch/conferenceOtherViews.py?view=standard&confId=149042 |
12 October | Cern, Switzerland | Staged Rollout Process | 1 |
|
13-14 October | Barcelona | HPC SysAdmin Meeting'11 | 1 |
http://hpc.xrqtc.org/index.php/conference-training/anual-meeting |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|---|---|---|
OCDgLite. An easy way to deploy a customized gLite grid environment | EGI Technical Forum 2011 (19-23 September). Poster. | Jesús Santisteban, Miguel Angel Díaz, Manuel Enrique Cotallo | |
Despliegue auto-adaptativo e inteligente de aplicaciones grid basado en la Búsqueda de Entorno Variable | VIII Congreso español sobre metaheuristicas, algoritmos evolutivos y bioinspirados - Conference | María Botón-Fernández, Miguel A. Vega-Rodríguez, Francisco Prieto Castrillo | |
Modelo de despliegue auto-adaptativo en entornos grid desde las perspectiva de los sistemas complejos | VIII Congreso español sobre metaheuristicas, algoritmos evolutivos y bioinspirados - Conference | María Botón-Fernández, Francisco Prieto Castrillo, Miguel A. Vega-Rodríguez | |
Self-Adaptive and Intelligent Deployment of Grid Applications Based on Several Perspectives from the Artificial Intelligence Field | Applied Soft Computing (Elsevier) - Journal | María Botón-Fernández, Miguel A. Vega-Rodríguez, Francisco Prieto Castrillo |
2. ACTIVITY REPORT
2.1. Progress Summary
- It was produced a report on error messages of LCMAPS which needs to be fixed. The report has been sent to SA1 coordinators, and introduced in the following RT ticket: https://rt.egi.eu/rt/Ticket/Display.html?id=1983
- It was submitted an internal survey to the Ibergrid sites about evaluation of the quality of services and tools at disposal of the site administrators. The NGI IBERGRID Internal survey were analyzed and discussed with the Ibergrid sites in the weekly Ibergrid Operations meeting.
- It was launch a new operations Wiki: http://ibergrid.lip.pt. This new wiki is more flexible than the previous one.
- It was analyzed the 1st EGI review report.
- In order to Ibergrid sites configuring their services to have VOMS redundancy for the Ibegrid VOs, we have created an action in the weekly Ibergrid Operations meeting. The deadline for this action was on the 21st October, and after that date we have started to check what sites are supporting it correctly. We will open a ggus ticket to the sites that are failing.
- For the implementation of the TopBDII HA proposal in NGI_IBERGRID, we have decided to have two primary DNSes to support automatic updates: one in Portugal (operated by LIP in NCG-INGRID-PT site) and one in Spain (hosted by CESGA). It was opened the ggust ticket https://ggus.eu/ws/ticket_info.php?ticket=74883 to carry out this action.
2.2. Main Achievements
- Two new sites were joined to the infrastructure: ARAGRID-CIENCIAS and RC-GISELA-CETA.
- It has been installed a dedicated WMS to support the Ibergrid VOs.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
UOGRID site is still suspended. | This site entering in suspension status after 1 month of downtime during the last QR5. |
There was several issues related with the Ibergrid Regional Nagios:
|