Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR4 | Ibergrid | LIP & CSIC | G. Borges (LIP) |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
- | - | - | - | - |
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) | |||||
---|---|---|---|---|---|---|---|---|---|
11-14 April | Vilnius, Lithuania | EGI User Forum 2011 | 3 | http://uf2011.egi.eu/ | |||||
14-16 April | Ljubljiana, Slovenia | ICANNGA, LNCS (Springer) | 1 | Paper accepted: "Sensitiveness of Evolutionary Algorithms to the Rando Number Generator", http://www.icannga.com/icannga11.php | |||||
11-14 April | Vilnius, Lithuania | EGI User Forum 2011 | 1 | Contribution for the session “Virtualisation and Cloud Computing” with the presentation “Federated cloud computing enviroment for malaria fighting”, https://www.egi.eu/indico/contributionDisplay.py?contribId=30&confId=207 | |||||
2 March | Amsterdam, Netherlands | Task Leaders and AMB F2F meeting | 1 | Contribution for session "Manual Metrics Collection, https://www.egi.eu/indico/conferenceDisplay.py?confId=351 | |||||
11-14 April | Vilnius, Lithuania | EGI User Forum 2011 | 2 | M. Caubet presented the work “Site integral management with Puppet” describing PIC experience managing hundreds of nodes in an automated way with the tool Puppet, https://www.egi.eu/indico/contributionDisplay.py?contribId=133&sessionId=20&confId=207 | |||||
11-14 April | Vilnius, Lithuania | EGI User Forum 2011 | 2 | J. Flix presented the work “Improving CMS data transfers among its distributed Computing Facilities“ describing the performance analysis and optimisation of the FTS transfers carried out in the context of the CMS experiment, | |||||
10-11 February | Lyon, France | LHC OPN meeting | 1 | Follow up of the LHC Optical Private Network group activities. The WLCG Tier1 centres are represented and G. Bernabeu was attending representing PIC. One of the key topics was the discussion on the networking requirements and infrastructure for Tier2s, https://indico.cern.ch/conferenceDisplay.py?confId=110149 | 7-8 March | Lyon, France | LHCb Tier1 Jamboree | 2 | Annual face to face meeting of the LHCb experiment with the Tier1 centres to follow up the computing services status and discuss about future activities and planning. V. Méndez and G. Merino were attending representing PIC Tier1 and presented results on the deployment of CernVM-FS for the LHCb software distribution, http://indico.in2p3.fr/conferenceTimeTable.py?confId=4854
16-17 March 2011 Göttingen 5th dCache Workshop G. Bernabeu http://indico.desy.de/conferenceDisplay.py?confId=3959 Annual meeting of the dCache developers and main user sites to discuss future plans and release planning. 4-8 April 2011 CERN, Geneva CMS Computing & Offline week J. Flix Follow up of the CMS WLCG activities. J. Flix was attending from PIC as CMS contact person at the Tier1. https://indico.cern.ch/conferenceOtherViews.py?view=standard&confId=132001 11 April 2011 Madrid Meeting of the Networking Group for the LHC in Spain G. Bernabeu Annual meeting of the WLCG sites in Spain with the NREN (RedIRIS) to present and discuss about the status of the network infrastructures at the Sites and at the NREN level and its impact on the WLCG present and future activities.
|
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
- The IBERGRID r-Nagios service has been configured to use Ibergrid core services in a failover. The only service for which there is not a failover mechanism is for MyProxy service.
- Start enforcing the support on regional macro VOs. The policy is that sites in the region should provide at least the 20% of their resources to the regional macro VOs indicated as a payment of the international services provided by the NGI. If it is not possible (if the local infrastructure is owned by dedicated projects) sites should select at least one of these macro VOs and provide opportunistic access. Simultaneously the decomission of old regional VOs started.
- Regional VOMS replication scheme implementation in progress. The aim is to keeping DB copies of a main host (MASTER) in a secondary host (SLAVE). By architecture, the slave host will only have read access to the Database entries.
- Successfull upgrades on the regional operation dashboard and on the regional nagios.
- Enforcement of the phase out of EGEE name in the information system.
- Internal discussion of the Resource Centre OLA (ongoing).
- Produce internal documentation on accounting, benchmarking and on gLite-Cluster node.
- Following a request from WLCG, we have developed a schema to support TopBDIIs in high availability mode.
- Contribution on a best effort basis to the Certification Manual documentation.
- Several IBERGRID sites contributed to the Stage Rollout process.
- Completion of the Survey for supported OS platforms, LB, service management and monitoring (for EMI components).
- Provide input to the list of components from EMI 1.0 that should be integrated in UMD with high priority.
- Both Portugal and Spain have provided self-assessment input of NGI international tasks for MS109.
- Provide feedback to deliverable D4.2 - Annual Report on the EGI Production Infrastructure
- Review of the deliverables D5.2 - Annual Report on the status of the software provisioning activity and the work of DMSU; and D6.3 - Annual Report on the Tools and Services of the Heavy User Communities
- Ibergrid ROD team was invited to share their support model and experience with regional tools during the ROD session in EGI User Forum (https://www.egi.eu/indico/contributionDisplay.py?sessionId=9&contribId=210&confId=207)
2.2. Main Achievements
- Invitation to report the IBERGRID operational model in the ROD session in EGI User Forum (https://www.egi.eu/indico/contributionDisplay.py?sessionId=9&contribId=210&confId=207)
- Assessement of the high availability schema for the regional TopBDIIs
- Successfull upgrades on the regional operation dashboard and on the regional nagios.
- Stage Rollout participation
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
MyProxy represents a single point of failure for the regional nagios service | We were investigating the possibility of using Robot certificates for the IBERGRID r-Nagios |
Identified timeout problem with VOMS | Open GGUS ticket #69356 - VOMS support recognized the issue has a bug |
Sync problems between regional and central dashboard | GGUS #68414 Ticket opened and assigned to COD |
Notification problem bewtween r-NAGIOS and Operational Portal | GGUS #68414 Ticket opened and assigned to COD |
Spanish sites had a GÉANT network issue (since 13:30 PM to 18:00 PM on the 03/17/2011) with consequences in availability/reliability metrics | GGUS ticket #68848 was open in order to do not take into account that period in the A/R metrics. |