https://wiki.egi.eu/w/api.php?action=feedcontributions&user=Mbraun&feedformat=atomEGIWiki - User contributions [en]2024-03-29T01:45:36ZUser contributionsMediaWiki 1.37.1https://wiki.egi.eu/w/index.php?title=NGI_DE_CH_Operations_Center:Operations_Meeting:14062013&diff=56548NGI DE CH Operations Center:Operations Meeting:140620132013-06-14T08:02:06Z<p>Mbraun: /* Round the sites */</p>
<hr />
<div>[[NGI_DE_CH_Operations_Center:Operations_Meeting|Operations Meeting Main]]<br />
<br />
==Introduction==<br />
<br />
* Minutes of last meeting<br />
<br />
HepSpec:<br />
due to kernel performance depending on cores number -> 5-10% more performance.<br />
<br />
<pre><br />
NOT in repository and why:<br />
For UMD-3:<br />
- STS 1.1.0<br />
- Hydra 3.0.0 (Also pending in UMD-2)<br />
- Pseudonymity 1.2.0<br />
<br />
For UMD-2:<br />
- Globus OGSA-DAI<br />
- CREAM-LSF<br />
<br />
Note that the LSF module for CREAM has currently no early adopters, since the EA team migrated to EMI-3 (released in UMD-3).<br />
<br />
SA2 is going to remove them from the Sw provisioning queue. If any of this product is relevant for your resource centres or your user communities, please contact me or the EGI Staged Rollout manager (João Pina) to agree on the staged rollout of these products.<br />
<br />
SA2 is, of course, more than happy to release these products if requested and if there are sites willing to perform staged rollout.<br />
</pre><br />
<br />
==Announcements==<br />
<br />
* Meetings/conferences<br />
* Availability/reliability statistics<br />
Mai: 94 % 95 %<br />
* Monitoring<br />
* Staged rollout/updates<br />
<br />
UMD 2.6.0 has been released<br />
http://repository.egi.eu/2013/06/12/release-umd-2-6-0/<br />
<br />
==Round the sites==<br />
<br />
; NGI-DE<br />
* BMRZ-FRANKFURT (Uni Frankfurt)<br />
* DESY-HH<br />
* DESY-ZN<br />
* FZJuelich<br />
* Goegrid<br />
* GSI<br />
* ITWM<br />
Unfortunately we can not attend today. Here are some points:<br />
** downtime of one DPM (raid disk replacement, more capacity)<br />
** ticket because of insecure kernel version was resolved due to false positive<br />
* KIT (GridKa, FZK-LCG2)<br />
* KIT (Uni Karlsruhe)<br />
* LRZ<br />
* MPI-K<br />
* MPPMU<br />
* RWTH Aachen<br />
* SCAI<br />
* Uni Bonn<br />
* Uni Dortmund<br />
* Uni Dresden<br />
* Uni Freiburg<br />
* Uni Mainz-Maigrid<br />
* Uni Siegen<br />
* Uni Wuppertal<br />
; SwiNG<br />
* CSCS<br />
* PSI<br />
* Switch<br />
<br />
Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.<br />
<br />
==Status ROD==<br />
<br />
* Any problematic tickets?<br />
* Handover of the ROD shift<br />
* ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center:Operations_Teams#Shifts_rotation_table<br />
<br />
==AOB==<br />
<br />
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.</div>Mbraunhttps://wiki.egi.eu/w/index.php?title=NGI_DE_CH_Operations_Center:Operations_Meeting:14092012&diff=40553NGI DE CH Operations Center:Operations Meeting:140920122012-09-14T13:19:04Z<p>Mbraun: /* Round the sites */</p>
<hr />
<div>[[NGI_DE_CH_Operations_Center:Operations_Meeting|Operations Meeting Main]]<br />
<br />
==Introduction==<br />
<br />
* Minutes of last meeting<br />
<br />
==Announcements==<br />
<br />
* Meetings/conferences<br />
EGI: Technical Forum Prag next week<br />
* Availability/reliability statistics<br />
https://documents.egi.eu/public/RetrieveFile?docid=1332&version=2&filename=EGI_Aug2012.pdf<br />
<br />
90%<br />
<br />
RWTH-Aachen 68%<br />
UNI-FREIBURG 59%<br />
UNI-SIEGEN-HEP 31%<br />
<br />
* Monitoring<br />
update 17 tested.<br />
* Staged rollout/updates<br />
DN Publishing<br />
<br />
==Round the sites==<br />
<br />
; NGI-DE<br />
* BMRZ-FRANKFURT (Uni Frankfurt)<br />
* DESY-HH<br />
* DESY-ZN<br />
* FZJuelich<br />
* Goegrid<br />
* GSI<br />
* ITWM<br />
- all WNs and CEs updated to SL6 and EMI-2/UMD-2<br />
- one SE node, APEL node, site BDII still running glite 3.2<br />
- What is the status of this [https://operations-portal.egi.eu/broadcast/archive/id/725 EGI broadcast]?<br />
* KIT (GridKa, FZK-LCG2)<br />
* KIT (Uni Karlsruhe)<br />
emi migration. plans to update WN to EMI 2. any experience whit emi-wn?<br />
* LRZ<br />
* MPI-K<br />
* MPPMU<br />
- deployement of CVMFS<br />
* RWTH Aachen<br />
* SCAI<br />
* Uni Bonn<br />
* Uni Dortmund<br />
* Uni Dresden<br />
* Uni Freiburg<br />
* Uni Mainz-Maigrid<br />
* Uni Siegen<br />
* Uni Wuppertal<br />
; SwiNG<br />
* CSCS<br />
* PSI<br />
* Switch<br />
<br />
Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.<br />
<br />
==Status ROD==<br />
<br />
* Any problematic tickets?<br />
* Handover of the ROD shift<br />
* ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center:Operations_Teams#Shifts_rotation_table<br />
<br />
==AOB==<br />
<br />
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.</div>Mbraunhttps://wiki.egi.eu/w/index.php?title=NGI_DE_CH_Operations_Center:Operations_Meeting:14092012&diff=40552NGI DE CH Operations Center:Operations Meeting:140920122012-09-14T13:16:19Z<p>Mbraun: /* Round the sites */</p>
<hr />
<div>[[NGI_DE_CH_Operations_Center:Operations_Meeting|Operations Meeting Main]]<br />
<br />
==Introduction==<br />
<br />
* Minutes of last meeting<br />
<br />
==Announcements==<br />
<br />
* Meetings/conferences<br />
EGI: Technical Forum Prag next week<br />
* Availability/reliability statistics<br />
https://documents.egi.eu/public/RetrieveFile?docid=1332&version=2&filename=EGI_Aug2012.pdf<br />
<br />
90%<br />
<br />
RWTH-Aachen 68%<br />
UNI-FREIBURG 59%<br />
UNI-SIEGEN-HEP 31%<br />
<br />
* Monitoring<br />
update 17 tested.<br />
* Staged rollout/updates<br />
DN Publishing<br />
<br />
==Round the sites==<br />
<br />
; NGI-DE<br />
* BMRZ-FRANKFURT (Uni Frankfurt)<br />
* DESY-HH<br />
* DESY-ZN<br />
* FZJuelich<br />
* Goegrid<br />
* GSI<br />
* ITWM<br />
What is the status of this [https://operations-portal.egi.eu/broadcast/archive/id/725 EGI broadcast]?<br />
* KIT (GridKa, FZK-LCG2)<br />
* KIT (Uni Karlsruhe)<br />
emi migration. plans to update WN to EMI 2. any experience whit emi-wn?<br />
* LRZ<br />
* MPI-K<br />
* MPPMU<br />
- deployement of CVMFS<br />
* RWTH Aachen<br />
* SCAI<br />
* Uni Bonn<br />
* Uni Dortmund<br />
* Uni Dresden<br />
* Uni Freiburg<br />
* Uni Mainz-Maigrid<br />
* Uni Siegen<br />
* Uni Wuppertal<br />
; SwiNG<br />
* CSCS<br />
* PSI<br />
* Switch<br />
<br />
Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.<br />
<br />
==Status ROD==<br />
<br />
* Any problematic tickets?<br />
* Handover of the ROD shift<br />
* ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center:Operations_Teams#Shifts_rotation_table<br />
<br />
==AOB==<br />
<br />
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.</div>Mbraunhttps://wiki.egi.eu/w/index.php?title=NGI_DE_CH_Operations_Center:Operations_Meeting:06072012&diff=38065NGI DE CH Operations Center:Operations Meeting:060720122012-07-06T11:52:13Z<p>Mbraun: /* Round the sites */</p>
<hr />
<div>[[NGI_DE_CH_Operations_Center:Operations_Meeting|Operations Meeting Main]]<br />
<br />
==Introduction==<br />
<br />
* Minutes of last meeting<br />
<br />
==Announcements==<br />
<br />
* Meetings/conferences<br />
EGI Tech.Forum 2012<br />
http://tf2012.egi.eu/<br />
<br />
* Availability/reliability statistics<br />
https://documents.egi.eu/public/RetrieveFile?docid=1251&version=2&filename=EGI_Jun2012.pdf<br />
Core services: 100%<br />
NGI_DE 95 % 95 %<br />
all sites hit a/r :)<br />
<br />
* Monitoring<br />
waiting for update 17<br />
<br />
* Staged rollout/updates<br />
<br />
Middleware Baseline Versions for WLCG<br />
https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineVersions<br />
<br />
Site Location<br />
https://helpdesk.ngi-de.eu/?mode=ticket_info&ticket_id=2386<br />
<br />
==Round the sites==<br />
<br />
; NGI-DE<br />
* BMRZ-FRANKFURT (Uni Frankfurt)<br />
* DESY-HH<br />
* DESY-ZN<br />
* FZJuelich<br />
* Goegrid<br />
* GSI<br />
* ITWM<br />
- Update of one CE, SE, UI and WNs to SL6 x86_64 and EMI-2<br />
- Staged rollout of DPM_mysql, WN +TORQUE_client for UMD-2<br />
- SE (DPM_mysql) without problems, looking at Known Problems and GGUS for<br />
other products strongly recommended<br />
(e. g. GGUS #82746, #82899, #83398, #83548, #83692, ...)<br />
* KIT (GridKa, FZK-LCG2)<br />
emi update ongoing<br />
* KIT (Uni Karlsruhe)<br />
* LRZ<br />
* MPI-K<br />
* MPPMU<br />
* RWTH Aachen<br />
* SCAI<br />
* Uni Bonn<br />
* Uni Dortmund<br />
* Uni Dresden<br />
* Uni Freiburg<br />
* Uni Mainz-Maigrid<br />
* Uni Siegen<br />
* Uni Wuppertal<br />
; SwiNG<br />
* CSCS<br />
* PSI<br />
* Switch<br />
<br />
Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.<br />
<br />
==Status ROD==<br />
<br />
* Any problematic tickets?<br />
MPI-K<br />
83822<br />
* Handover of the ROD shift<br />
* ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center:Operations_Teams#Shifts_rotation_table<br />
<br />
mask alarms?<br />
<br />
Performance:<br />
2012-01 NGI_DE 6 12<br />
2012-02 NGI_DE 2 1<br />
2012-03 NGI_DE 0 4<br />
2012-04 NGI_DE 2 14<br />
2012-05 NGI_DE 0 37<br />
2012-06 NGI_DE 0 8<br />
2012-07 NGI_DE 0 4<br />
<br />
==AOB==<br />
<br />
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.</div>Mbraunhttps://wiki.egi.eu/w/index.php?title=NGI_DE_CH_Operations_Center:Operations_Meeting:09032012&diff=33936NGI DE CH Operations Center:Operations Meeting:090320122012-03-09T09:26:29Z<p>Mbraun: /* Round the sites */</p>
<hr />
<div>[[NGI_DE_CH_Operations_Center:Operations_Meeting|Operations Meeting Main]]<br />
<br />
==Introduction==<br />
<br />
* Minutes of last meeting<br />
<br />
==Announcements==<br />
<br />
* Meetings/conferences<br />
** EGI Community Forum https://www.egi.eu/indico/conferenceDisplay.py?confId=679<br />
** [https://www.egi.eu/indico/conferenceDisplay.py?confId=820 Ops-Workshop im April 2012] Agenda not yet available.<br />
* Availability/reliability statistics<br />
Feb:<br />
VoOps:<br />
Av/Re= 97%<br />
UNI BONN=69%<br />
<br />
BDII: Av/Re=99,3%<br />
<br />
* Monitoring<br />
https://helpdesk.ngi-de.eu/index.php?mode=ticket_info&ticket_id=1969<br />
https://helpdesk.ngi-de.eu/index.php?mode=ticket_info&ticket_id=1978<br />
* Staged rollout/updates<br />
<br />
==Round the sites==<br />
<br />
; NGI-DE<br />
* BMRZ-FRANKFURT (Uni Frankfurt)<br />
* DESY-HH<br />
* DESY-ZN<br />
* FZJuelich<br />
* Goegrid<br />
* GSI<br />
* ITWM<br />
ITWM will not be able to attend the phone conference. There is nothing special to report.<br />
* KIT (GridKa, FZK-LCG2)<br />
* KIT (Uni Karlsruhe)<br />
* LRZ<br />
* MPI-K<br />
* MPPMU<br />
* RWTH Aachen<br />
* SCAI<br />
* Uni Bonn<br />
* Uni Dortmund<br />
* Uni Dresden<br />
* Uni Freiburg<br />
* Uni Mainz-Maigrid<br />
* Uni Siegen<br />
* Uni Wuppertal<br />
; SwiNG<br />
* CSCS<br />
* PSI<br />
* Switch<br />
<br />
Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.<br />
<br />
==Status ROD==<br />
<br />
* Any problematic tickets?<br />
* Handover of the ROD shift<br />
* ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center:Operations_Teams#Shifts_rotation_table<br />
<br />
==AOB==<br />
<br />
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.</div>Mbraunhttps://wiki.egi.eu/w/index.php?title=NGI_DE_CH_Operations_Center:Operations_Meeting:21102011&diff=26295NGI DE CH Operations Center:Operations Meeting:211020112011-10-21T13:17:26Z<p>Mbraun: /* Round the sites */</p>
<hr />
<div>[[NGI_DE_CH_Operations_Center:Operations_Meeting|Operations Meeting Main]]<br />
<br />
==Introduction==<br />
<br />
* Minutes of last meeting<br />
<br />
* SGE Support for cream from EMI Update 9<br />
<br />
==Announcements==<br />
<br />
* Meetings/conferences<br />
* Availability/reliability statistics<br />
The Availability/Reliability League statistics for September 2011 have been added to:<br />
https://wiki.egi.eu/wiki/Availability_and_reliability_monthly_statistics<br />
<br />
UNI-Karlsruhe did not hit the targets and they were requested by Dimitri via email to update the corresponding ticket<br />
* Monitoring<br />
Email from Dimitri on Monday, 17. October 2011 14:17:<br />
Dear NGI-DE/NGI-CH sites manager,<br />
as you know, nagios SAM tests where using Wen Mei proxy certificates with OPS VO extension to submit SAM tests.<br />
This weekend Wen Mei's membershift in OPS VO expired, even her certificate is still vallid. This was cause of weekend failures <br />
for nagios SAM tests. Now tests are running under Foued Jrad certificate with OPS VO extension. But still some sites have failed <br />
tests. This looks like a mapping problem. So please check the mapping for Foued Jrad.<br />
In next days we would exchange this certificate with a robot certificate for SAM nagios tests and inform you.<br />
* Staged rollout/updates<br />
* Quater report August-October<br />
Email from Jie Tao on Tuesday, 18. October 2011 12:36:<br />
Jie is collecting information for the coming quarter report (QR 6) covering August, September and October. She is expecting your <br />
contribution by October 31. Please send her (email: jie.tao@kit.edu) the report of your site directly. As the last QR, I need <br />
infos about:<br />
Main achievements <br />
Issues and mitigations<br />
conference/workshop organized (date, location, title, participants, short report)<br />
other conferences attended (date, location, title, participants, short report)<br />
Publications (title, journal/conference, volume No., page No., authors)<br />
ITWM, LRZ-LMU, JUERLICH: how many staged rollout components do you have for the reported quarter? (i.e. number of patches tested)<br />
Thank you in advance.<br />
<br />
==Round the sites==<br />
<br />
; NGI-DE<br />
* BMRZ-FRANKFURT (Uni Frankfurt)<br />
* DESY-HH<br />
* DESY-ZN<br />
* FZJuelich<br />
* Goegrid<br />
* GSI<br />
* ITWM<br />
- Staged rollout for glite-TORQUE_client (Patch #5060)<br />
* KIT (GridKa, FZK-LCG2)<br />
FTS Connection problems for Oracle back end <br />
dCache OPS failing up to time<br />
<br />
* KIT (Uni Karlsruhe)<br />
* LRZ<br />
* MPI-K<br />
* MPPMU<br />
- SAM test mapping issue solved<br />
- upgrading to glite-CREAM > 3.2.13-1<br />
- Down Time next week <br />
* RWTH Aachen<br />
* SCAI<br />
* Uni Bonn<br />
* Uni Dortmund<br />
* Uni Dresden<br />
* Uni Freiburg<br />
* Uni Mainz-Maigrid<br />
* Uni Siegen<br />
* Uni Wuppertal<br />
; SwiNG<br />
* CSCS<br />
* PSI<br />
* Switch<br />
<br />
Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.<br />
<br />
==Status ROD==<br />
<br />
* Any problematic tickets?<br />
* Handover of the ROD shift<br />
42 17.10 23.10 Team3, KIT <br />
43 24.10 30.10 Team4, JUELICH <br />
44 31.10 06.11 Team5, BADW-LRZ <br />
45 07.11 13.11 Team6, CSCS/NGI_CH <br />
* ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center:Operations_Teams#Shifts_rotation_table<br />
<br />
==AOB==<br />
<br />
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.</div>Mbraun